Our Solar Installation Process in Melbourne
Design & engineering process
Our solar installation process in Melbourne is designed so you are not managing the project yourself. We handle the whole path — working out what your home actually needs, designing the system, getting it approved, installing it, and looking after it once it is running. You get one team and one point of contact from the first call to the final handover.
Consultation & assessment
We look at your electricity bills, your roof, and how your household actually uses power through the day. That tells us what size system makes sense — not just the biggest one we can fit. We also work out your STC rebate entitlement upfront, so the number you see is the number you pay.
Custom design & approval
We design the system around your roof, not a template — panel layout, inverter sizing, and battery capacity all sized against each other. Then we handle the paperwork: council requirements where they apply, and grid connection approval with your distributor. You do not chase anyone.
Professional installation
Installation is done by CEC-accredited installers to Australian Standards. Panels carry a 25-year warranty and inverters 10 years. Before we leave, we test the system end to end, walk you through the monitoring app, and hand over the documentation you need for your rebate and warranty claims.
Ongoing support & maintenance
Your system is monitored so drops in output get picked up early rather than showing up on a bill months later. If something needs attention, we come back — same team, no call centre. Routine checks keep panels clean and output where it should be.
Frequently asked questions
Timeframes, approvals, and what happens at each stage.
How long does the whole solar installation process take?
From first consultation to a working system, most residential jobs run four to eight weeks. The installation itself is usually a single day. The bulk of that timeline is grid connection approval with your distributor, which sits outside our control but is handled entirely by us.
Do I need to apply for approvals myself?
No. We lodge the grid connection application with your distributor and handle council requirements where they apply. You are not chasing paperwork or following up with anyone.
What happens during the site assessment?
We check roof orientation, shading through the day, available space, and switchboard condition. Older switchboards sometimes need an upgrade before a system can be connected, and it is better to know that before you commit than after.
Is the quote fixed or does it change later?
The quote is fixed after the site assessment, with your STC rebate already deducted. Variations only arise if you change the system after quoting.
What support do I get after installation?
Your system is monitored so output drops are picked up early. Warranty claims are handled by us with the manufacturer rather than left to you, and the same team comes back if something needs attention.